Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 青青伊人国语 | 久久无码中文字幕免费影院 | 五月婷婷视频在线 | 在病房里和护士啪啪 | 91在现看| 欧美成人aaaaaaaa免费 | 大地资源在线观看免费高清版 | 久久精品人人 | 国产亚洲精品久久久久久久久久久久 | 色天使亚洲综合一区二区 | 午夜aaaa| 久久色亚洲| 男女做爰裸体猛烈吃奶摸视频 | 黄色大片av | 在线观看羞羞视频 | 国产一区高清在线观看 | 国产精品免费久久久 | 久草免费视| 欧美日韩国产高清一区二区 | 国偷自拍第113页 | 日本熟妇中文字幕三级 | 色久在线 | 女友之健身房调教 | 日本免费看黄 | 午夜影院18 | 午夜黄网| 白嫩无码人妻丰满熟妇啪啪区 | 黑人巨摘花第一次出血 | 六月综合 | 99久久精品费精品蜜臀 | japanese mature熟乱 | 94一欧美一setu | 天天躁狠狠躁日日躁黑人 | 红桃视频国产精品 | 黄色大片免费在线观看 | 国产重口老太与小伙子 | 公主揉肉蒂高潮h失禁视频 亚洲爽视频 | 韩日av| 国产精品大全 | 免费小视频 | 国产成人久久精品二区三区 |